Ramtech Building is now nearing completion of the interior and exterior finish-out phase on the construction of the new 37,329 square foot modular school building for Arlington Classics Academy. (more…)
Ramtech has completed the final phase of the installation of the temporary school campus we built for the Deweyville Independent School District in Orange, Texas. The relocatable modular school project is structured as a 36-month lease and includes a total of eleven buildings which replaced the district’s elementary school that was destroyed during the flooding which occurred in March of this year. (more…)
At the Industrialized Building Code Council meeting held on the 22nd of August, the Council approved the adoption of the proposed building codes with the amendments that were presented by the code adoption committee. The new codes are as follows: (more…)
Ramtech has completed the setting of the modular sections and is moving into the finish-out phase on the construction of a new 37,329 square foot modular school building for Arlington Classics Academy, located on the charter school’s eleven acre campus in Dalworthington Gardens, Texas. The design-build project is being built using Ramtech’s Accelerated Building System (ABS) prefabricated construction method. (more…)
Ramtech will be exhibiting our relocatable modular buildings, permanent modular construction (PMC), and Accelerated Building System (ABS) prefabricated construction capabilities in booth 1032 at the 2016 Texas Municipal League annual conference and exhibition being held on October 5-7 at the Austin Convention Center in Austin, Texas. (more…)