Tuesday, 12 January 2016 / Published in Ramtech News

Blue Ridge Methodist ChurchRamtech was able to get out to Blue Ridge over the holiday and photograph the $1.51 million modular church building we designed and built for First United Methodist Church. (more…)

Tuesday, 12 January 2016 / Published in Education

Melissa ISDRamtech is now featuring as part of our project portfolio the $1.5 million eight-classroom facility we recently completed for the Melissa (TX) Independent School District.   (more…)

Tuesday, 15 December 2015 / Published in Ramtech News

Randolph Field excavationRamtech is now well underway with the site development work in preparation for the installation of the new high school facility for Randolph Field ISD. The design-build contract calls for us to provide complete turnkey services to the district for a 47,448 square foot two-story facility using our Accelerated Building System (ABS) prefabricated construction method. (more…)

Monday, 07 December 2015 / Published in Ramtech News

Ferris ISD ExteriorRamtech recently completed a 13,440 square foot classroom building at the Junior High campus of Ferris (TX) Independent School District.  Built using our traditional permanent modular construction process, the new 12 classroom facility includes a fully equipped science lab and administrative office space. This modular school building has a full masonry exterior to blend in with the existing campus structure, and wall-mounted HVAC units to provide efficient heating and cooling to each room. Ramtech was also responsible for all of the site development work including the extension and connection of utilities. (more…)

Monday, 16 November 2015 / Published in Ramtech News

Ramtech was pleased to host a tour of RMD’s manufacturing plant for the attendees of the Modular Building Institute’s Dallas Modular Construction Summit held on November 4th at the Hyatt Regency Dallas hotel and conference center. Ramtech’s Mike Slataper, Linc Moss, Roland Brown, and Gary White fielded questions and provided attendees with a perspective on how we approach the manufacturing of relocatable and permanent modular buildings as design-build construction company. (more…)

TOP