Ramtech was approached to assist with the design, manufacture, and installation of a 2,656 s.f. Hydrogen Sulfide testing lab. The permanent modular building was placed in a tight footprint between two taller existing structures which had windows that faced the testing lab, so a site-built parapet wall extending approximately two feet above the roof line was designed to screen the view of the extensive rooftop mechanical equipment. HCF Silhouette horizontal concealed fastener steel siding was site installed on the two side walls along with masonry veneer covering the front and rear of the building. To provide the most vertical interior space possible, the building was designed with a perimeter frame with columns to eliminate the need for deep trusses in the ceiling cavity.
Building & Construction Details: Pier and Beam Permanent Modular Construction
Project Size: 2,656 sq ft
Construction: Type V-b
Contract Type: Design-bid-build
Facility Use: Sour gas testing lab
Description: Testing lab with 10 walk-in vent hoods and control room and gas storage area
Completion: 150 days
- CLIENT ChampionX
- YEAR 2021
- CATEGORY Commercial Permanent Pier and Beam
- TAGS