This 4,320 sf building provides office and engineering space in support of the final system integration and flight test activities for the Multinational MEADS Air Defense Program. Developed as a design-build project for El Paso-based CF Jordan Construction, the facility was installed on a heavily reinforced nine-inch concrete slab foundation designed to withstand any ground movement from testing activity around the surrounding area. To help achieve this stability, Ramtech attached the structure to 24 x 24 plinths, comprised of steel reinforced block piers connected to the concrete slab with #6 dowels and #3 horizontal ties. Built to meet Anti-Terrorism/ Force Protection compliance, the building incorporates vandal resistant security bars over the windows with fragment retention film on the windowpanes.
Building & Construction Details: Permanent Modular Construction
Project Size: 4,320 sq ft
Construction Type: IBC Type V-b
Contract Type: Design-build
Facility Use: Office and Engineering Space
Description: 17 offices, conference and data rooms, and break area. Exterior has 26-gauge hi-ribbed R-panel steel siding, while interior is finished out with VCG walls and carpet tile flooring in the main areas, and static dissipative vinyl composition tile for the data room.
Completion: 90 days
- CLIENT NATO Office Building
- CATEGORY Commercial RB Select , Commercial Relocatable , Government RB Select
- TAGS