As part of a district-wide multi-building expansion project for the Seminole ISD, Ramtech added a multi-purpose gymnasium, an elementary school classroom wing, and a new maintenance facility utilizing steel building systems for all three projects.
The gymnasium is connected by a corridor to the main high school campus structure and was designed to match the architecture and interior and exterior finishes of the existing building. The gym area contains basketball and volleyball courts along with a gymnastic runway on a cushioned suspended wood floor playing surface.
The interior also includes a large split level lobby area, girls and boys dress – ing rooms, weight training room, coaching offices, concession area, and public restrooms.
Building & Construction Details: Permanent Modular Construction
Project Size: 20,500 sq ft
Construction Type: SBC Type II
Contract Type: Design-build with guaranteed maximum price
Description: Double-court gymnasium
Completion: 13 months
- CLIENT Seminole ISD, Gymnasium
- CATEGORY Education Permanent Slab-on-Grade , Education SOG Select
- TAGS