Constructed using Ramtech’s Accelerated Building System, this building is a part of the Tolar ISD High School expansion. The building functions as a ten-classroom elementary school addition with restrooms. The building is fabricated using full steel frame construction including a clear span steel truss roof support. The classroom division walls are full height and insulated to reduce sound transmission. To minimize roof penetrations and increase usable interior space, the HVAC systems utilize pad mounted condensing units and attic mounted air handlers with individual thermostats for each room. The exterior is finished with the same rock exterior in order to match the other major buildings on the campus.
Building & Construction Details: Permanent Modular Construction Slab on Grade
Project Size: 9,856 sq ft
Construction: UBC Type V
Contract Type: Design-Build Purchased through BuyBoard
Facility Use: Classroom Wing
Description: Permanent modular Grade level entries Exteriors match existing school finishes
Completion: 90 days
- CLIENT Tolar ISD, High School Expansion
- CATEGORY Education Highlight , Education Permanent Slab-on-Grade
- TAGS