Ramtech was selected as a strategic subcontractor to Hensel Phelps Construction Company and was responsible for the manufacturing and installation of twenty-four 18,000 square foot two-story buildings, and six 8,000 sq. ft. one-story buildings for the Army’s new Company Operation Facilities at Ft. Bliss, Texas. Originally started in April 2007 task orders 001-002-003 included requirements for Company Operation Facilities for the US Army Milcon expansion at Fort Bliss, Texas, three task orders were issued totaling $32 million. The projects requirement for multiple permanent buildings in a compressed construction timeframe was an ideal application for Ramtech’s Accelerated Building System.
Building & Construction Details: Permanent Slab on Grade Modular Building
Project Size: 432,000 sq ft – (24) 2-story buildings 48,000 sq ft (6) 1-story buildings
Completion: BCT-1 & 2 March 2009 BCT-3 March 2010
Construction Type: Type III
Facility Use: Company Operation Facilities
Description: Multi-story & single-story buildings Designed exteriors to match existing base facilities Masonry wainscot with stucco-clad metal panel
- CLIENT US Army Corps of Engineers Fort Bliss
- CATEGORY Government Permanent Slab on Grade