Ramtech provided full design-build services for the development and construction of this 8,500 square foot addition to the existing community-based outpatient clinic in Myrtle Beach, South Carolina. Because the original contractor was removed from the project for non-performance, Ramtech employed its Accelerated Building System to meet an expedited construction timeline. Located within two miles of the coast, the facility provided challenges to meet the foundation requirements due to a very shallow water table. The building features an EIFS exterior, multiple exam rooms, a TB isolation room, and an imaging center with a large x-ray area. A computer-controlled environmental management system was installed along with security and communications systems tied into the existing structure.

Building & Construction Details: Permanent Slab on Grade Modular Building

Project Size: 8,500 sq ft – 

Construction: UBC Type II-N

Contract Type: Design-build with stipulated sum

Facility Use: Medical clinic 

Description: Steel and concrete construction Brick wainscot and Carrara exteriors finishes

Completion: 120 days

 

TOP