Ramtech Building has begun the manufacturing on two permanent modular buildings we are constructing for the First Baptist Carrollton Church of Carrollton, Texas. The 26,624 square foot project will utilize our pier and beam permanent modular construction process to provide two education buildings as part of the church’s relocation from its current location. The first building, a 10,624 square foot facility for adults, incorporates a central corridor with seven classrooms and men’s and women’s restroom facilities on either side. The second building provides 16,000 square feet of space with two large worship areas, six classrooms, and a boys and girls restrooms for the middle and high school programs. We will provide a grade beam foundation with drilled and belled piers for the two structures which have been designed for parapet walls with full masonry exteriors, TPO roofs, and split system HVAC units. The interiors will utilize vinyl covered gypsum for the walls and a combination of carpet tile, vinyl composition tile, and sheet vinyl for the flooring. Ramtech will also install fire sprinkler systems in each building.
First Baptist Carrollton plans to relocate from its original Carrollton campus on Josey Lane to its new location known as The Fields at Carrollton Parkway. The church opened their Sports and Recreation Complex there in 2011, then in 2016 opened a second campus for worship and Bible study known as the Church at the Fields. The new modular buildings will sit adjacent to each other as part of a master plan that also includes a new site-built multipurpose worship facility and office buildings for the ministry staff. The project is slated to be complete and ready for occupancy in the Spring of 2019.