Ramtech is now hitting all cylinders after setting the last 14 modules on Wednesday of last week for the new Dallas Transitional Center residential reintegration facility for Lifestyle Management Inc. of Edmond, Oklahoma. After pouring the final section of the engineered concrete slab foundation seven days prior to the final set, Ramtech was able to finish the building set in under seven hours and weather-in the rest of the structure.
With the heavy spring rains causing site development delays all around the North Texas region, the speed of permanent modular construction using Ramtech’s Accelerated Building System has been essential in getting the project back on schedule by having the entire structure built and ready for installation as soon as the concrete slab was prepared. Even before the last modules were put in place, the plumbing manifolds, electrical and HVAC ductwork crossovers, fire sprinkler system, and secondary water barrier installations were already well underway. Ramtech is currently on schedule for a December finish on the four fully developed acres that house the 31,752 square foot project.